Using innovative engineering to maximise results for both the developer and the tenants.
This purpose-built facility for Mader Group sits within the Forrestfield/High Wycombe industrial area, providing excellent access to all the main arterial roads.
The build leveraged off Realside Ovest’s innovative engineering knowledge and its fabrication experience saving significant costs whilst also providing an impressive crane capacity to accommodate heavy industrial needs for the dual client tenants.
Site size
2.0ha
GLA
9,886sqm
Project Status
Completed asset
We have created a technologically advanced building that incorporates Realside Ovest’s industry knowledge and experience with the latest design techniques and building materials.
By supplying exceptional crane capacity in the building, Realside Ovest has ensured a level of equipment manoeuvrability not commonly seen in other sites.
Crane Capacity
90 tonne
Solar Array
100kw
Vehicle Access
RAV7
Sustainability feature
Passive Air Flow Design & high R-Value glass
Head Office: Level 6, 1008 Hay Street, Perth WA 6000
REALSIDE OVEST © · All rights reserved · Privacy Policy · Terms & Conditions | Website by Clout Marketing